The Fifth Desk · Evaluation

Act I · The Map

Architecture · Concert hall · 21st c. · a shoebox hall run as a tunnel through a faceted white solid, open to the city at both ends

Casa da Música

Rem Koolhaas (OMA) · a concert hall: a large auditorium, a smaller hall, rehearsal and education rooms, foyers, stairs and terraces in one building · a single faceted solid of white concrete, its walls and roofs inclined planes, standing alone on a raised paved plaza at the Rotunda da Boavista, Porto · the large auditorium, the Sala Suggia, a shoebox of about 1,200 seats run as a tunnel through the solid, both its short ends glazed in corrugated glass that opens the room to the city, its walls of wood panels printed or gilded with an enlarged wood grain in gold; the other rooms each finished in its own material, among them a room lined in blue and white Portuguese tiles and a roof terrace in a chequer of tiles · the concrete shell and the long walls of the main hall acting together as the structure, engineered by Arup with Cecil Balmond · commissioned through a competition of 1999 for Porto’s year as European Capital of Culture in 2001; it missed that year and opened in April 2005 · Rem Koolhaas with the Office for Metropolitan Architecture (OMA) · scored as the concert hall as it stands: the one building, its rooms and interiors as finished, and the plaza on which it sits; the city round the Rotunda is context

The Plate · the house in long section and in plan. On the left, the section: a raised plaza on its ground line; on it one faceted solid, drawn heavy, its outline a run of inclined planes; through the middle of it the large hall as a long tunnel, its two long walls drawn heaviest where they carry the solid, its two ends closed by wavering lines for the corrugated glass, and dotted lines running on from each end out to the edge of the plate for the city seen through them; a few faint wavy lines along the hall’s wall for the gold grain, and a raked floor rising to a platform at one end; a steep stair climbing from the plaza into the body of the stone; and small rooms cut in the mass above the hall, one filled with a chequer for the tiled terrace and one with a lattice for the tiled room. On the right, the plan: the plaza dashed; the irregular footprint of the solid; the hall a long band running from one facet to the opposite one, wavering at both ends; a smaller room beside it, and a stair zigzagging up in what is left

Mode

Concert hall as one carved solid: the hall the main cut and the structural core, the rest of the house the residue between hall and skin

Mythos

The stone hollowed, a cave cut through a found rock for gathering, open to light at both ends; the gem, the crystal and the meteorite invited by the form, evoked rather than built

Phase

Competition 1999 for the European Capital of Culture of 2001; that year missed; opened April 2005; in continuous use as a concert house for twenty-one years

Presentation

A faceted solid of white concrete on a raised plaza; a shoebox hall glazed at both ends in corrugated glass, its walls printed in an enlarged gold wood grain; rooms each finished in their own material, tiles, aluminium and chequer among them

Register

Wit and vertigo more often than transport: an abrupt white object across a roundabout, a steep stair into its body, sudden views through cuts, and one long gilded room with the city behind the players

Scale

One house of music and its public, a free-standing object on a ring road in a dense old city, from a plaza to a roof terrace

Governing Proposition

A concert house for a city’s year of culture is made as one solid of white concrete, faceted like a found stone, and its large hall is run straight through it as a tunnel, glazed at both ends, so that the orchestra plays against the city. Everything else in the house, the smaller hall, the rehearsal rooms, the foyers, stairs and terraces, is carved from what is left between the hall and the skin. The wager is that a concert hall need not be a sealed box withdrawn from the street, that the hall can be the structure of the building rather than a room wrapped inside it, and that a form taken from an unbuilt house can be offered to a city as its monument.

The Hall Through the Stone

7.8 / 10
Tier III · Major

Act II · The Essay

Movement I

European Capital of Culture

Porto was named European Capital of Culture for 2001, and a competition held in 1999 was to give the city a new house of music for that year. It went to Rem Koolhaas and the Office for Metropolitan Architecture, OMA, with Arup as engineers and Cecil Balmond among them. The site was the Rotunda da Boavista, a large roundabout on the ring of a dense old city, and the building was to stand there alone.

It missed the year it was made for. The house opened in April 2005, four years after the festival it was commissioned to crown, after a long overrun. The scheme it was built from had not been drawn for Porto at all. OMA has itself documented that the form derives from an unbuilt house design of the office’s, the Y2K house, whose living room was scaled up into the auditorium. A private design without a client became a civic monument.

The building is credited to Koolhaas with OMA, and the collaboration is not charged. The work scored is the concert hall as it stands: the one building, with its large and small halls, its rehearsal and education rooms, its foyers, stairs and terraces, its interiors as finished, and the raised plaza on which it sits. The city round the Rotunda is context. Twenty-one years on, the house has been in use as a concert house since it opened, and it has become the identity of the institution that bears its name.

Movement II

A House Scaled Up

From across the Rotunda the building is one white solid, abrupt and crystalline, its walls and roofs inclined planes of concrete, set down on a paved plaza like a meteorite in a nineteenth-century city. It refuses the street wall that the old town keeps. It has no front in the ordinary sense and no colonnade; one reaches it across the plaza and enters by a steep stair that climbs into its body.

The outline is the part of the building that its purpose does not compel. It is a house design made large, and its facets answer neither the hall nor the site. Inside, the stairs, foyers and odd rooms are what the cuts leave between the hall and the skin: residue, made into event, a public route that turns, climbs and opens without warning onto views out through the cuts and down into the hall. Much of the building is required by its concept more than by its use, and the circulation, for all its surprise, is confusing.

This is the building’s polemic, and it is credited as departure: a form indifferent to its programme, offered to a city that did not ask for it. But a form transplanted from a house is by definition not required by this one, and on the test of necessity the outline yields where the hall does not. The faceted outside, which is what the city knows, could be changed with little loss to the rooms within. The building clears the bar of necessity on the strength of its core, by two tenths.

Movement III

The City Behind the Orchestra

The large hall, the Sala Suggia, is a shoebox of about 1,200 seats: the type acoustics recommend, inherited from the halls of the nineteenth century, and the type the fashion of the vineyard hall, ascendant since Berlin, had set aside. It is not hung inside a decorative envelope. It runs as a tunnel straight through the solid, and its long walls are the building’s structure: the concrete shell and the walls of the hall act together, carrying the large openings and the steep inclined planes without a frame expressed or a skin hung. Remove the hall and the solid falls; remove the solid and the hall has no walls.

Both short ends of the hall are glass, corrugated and undulating, and they open the room to the city. By day the orchestra plays against a window with Porto behind it. That is the building’s plainest disclosure, that a concert hall need not be a sealed box of ritual withdrawn from the street, and that listening can be placed in the world rather than taken out of it. Change the form and the knowledge goes: put the same room in a closed shoebox, and a concert there no longer knows the city outside.

It is a heresy in a type built to shut out daylight and noise, and the corrugated glass is an inventive answer to acoustic and visual demands at once. The disclosure is partial. The shoebox remains a ritual room, and much of what the building gives is a stance, a provocation about the institution, nearer a mood of openness than a disclosed way of living. The second truth it tells, about Porto, is a dense old city given a free-standing object on its ring road; that too is a stance.

Movement IV

The Gold Grain

The walls of the large hall are wood panels printed or gilded with an enlarged wood grain in gold. At a distance, from the seats, it reads as gilding; close up it reads as print. It is a clever, cheap and effective surface, and with the undulating glass at each end turning daylight into a soft, rippling field behind the players, it makes the long room the building’s height. The approach gives a second elevation, the white stone seen across the Rotunda and the stair climbing into it; the stairs and terraces give a third, in sudden views.

The register is wit and vertigo more often than transport. The secondary spaces are bright and tight rather than elevating. Each room beyond the hall is finished in its own material: a room lined in blue and white Portuguese tiles, the azulejos; a roof terrace laid in a chequer of tiles; aluminium elsewhere. The variety is deliberate, and its quality is uneven, a collage of finishes more than a sequence of forms the purpose shapes.

The archetype the building reaches for lies here too, and stays mostly evoked. It is the stone hollowed: a found rock with a cave cut through it for gathering, open to light at both ends, and the hall is literally that void, reached by climbing into the mass. But no axis of approach dramatises the stone, no threshold is crossed into the cave as into a temple, and the house the form came from argues against reading it as a constructed myth. The tile room evokes Portugal by quotation. This is the lowest of the building’s measures but one, and with The Bottomless Well it holds the work below Tier IV.

Movement V

The Mass and the Collage

One law governs the building: one solid, carved, every space a cut through the mass and every opening a view through it, the hall the main cut and the rest subordinate. Structure, plan and approach obey it, from the bare white facet on the Rotunda to the gilded hall. A second law governs the interiors, a law of juxtaposition rather than unity, each room in its own material and register; and the outline obeys neither, but the logic of a house transplanted. Two laws, one of mass and one of collage, are joined by the office’s wit.

Its swerve is real and was paid for. Out of the shoebox halls of the nineteenth century, against the vineyard of its own day, after the iconic building of Bilbao and between Koolhaas’s Kunsthal and Educatorium and the Seattle library of a year before, it made the hall the structural core of a monolith and opened it to the city. Its reach has been narrower. It gave Porto a figure and Portugal a modern cultural emblem; but the concert hall since 2005 has gone toward the vineyard or surround room in a sculptural envelope, at Hamburg and Paris, its glazed ends were not widely followed, and it reinforced the shoebox’s return rather than causing it. The building has drawn study for twenty-one years, much of it returning to the story of its making, and its idea is legible on one visit.

Among its neighbours on the desk it stands level with Walt Disney Concert Hall (7.8), a hall of the same years, ahead of it on The Inevitable, The Unconcealment, The Swerve, The Living Form and The Bottomless Well, behind it above all on The Sublime and The Made, where Gehry’s room carries more elevation. It stands level too with the Elbphilharmonie (7.8). OMA’s Seattle Central Library and CCTV Headquarters, each credited to Koolhaas with a partner, stand a tenth above it at 7.9, on a larger swerve in each case; the Guggenheim Museum Bilbao (8.4) and the Sydney Opera House (8.6) stand above it on every one of the twelve, each a turn of its field, where Casa da Música is a strong instance within one.

Act III · The Twelve

1The Inevitable (Ananke)

Judged on purpose, structure and site. The large hall passes the subtractive test better than most halls of its decade. It is a shoebox, the type acoustics recommend, and it is not hung inside a decorative envelope but run as a tunnel through the solid, its long walls carrying the building: remove the hall and the solid falls; remove the solid and the hall has no walls. The glazed ends are its one bold addition, and they answer a stated purpose. What yields is the outline. The faceted shape is a house design scaled up, compelled neither by the hall nor by the site, and much of the circulation is residue made into event. Above the cap, by two tenths.

Score: 7.7 / 10

2The Unconcealment (Aletheia)

What the building brings into the open can be stated: a concert hall need not be a sealed box of ritual withdrawn from the street. In the large hall the orchestra plays against a window, the city of Porto behind it by day, so that listening is placed in the world rather than taken out of it; and the house as a whole is a field of public interiors, terraces and stairs open to anyone with a ticket to anything. A second truth concerns the city: a dense old town given a free-standing object on a ring road, refusing the street wall. Held at 7.7: the shoebox remains a ritual room, and much of what is given is a stance about the institution, nearer a mood of openness than a disclosed way of living.

Score: 7.7 / 10

3The Sublime (Hypsos)

Elevation comes in several places and in different registers. The large hall is the height: a long gilded room, its walls patterned in an enlarged grain that reads as gold at a distance and as print close up, with the undulating glass at each end turning daylight into a soft, rippling field behind the players. The approach gives a second kind: the white solid seen across the Rotunda, abrupt and crystalline, then entered by a steep stair that climbs into its body. Inside, stairs and terraces give sudden views out through cuts and down into the hall. What holds the axis: the register is wit and vertigo more often than transport, and the secondary spaces are bright and tight rather than elevating.

Score: 8.0 / 10

4The Archetypal Deep (Mythos)

The built archetype is the stone hollowed: a solid like a found rock, with a cave cut through it for gathering, open at both ends to light. It bears some load. The hall is literally a void carved through the mass, and one climbs into the stone to reach it. But the pattern is received half-consciously and presented as wit rather than built as rite. No axis of approach dramatises the stone, and no threshold is crossed into the cave as into a temple; the steep entrance stair serves circulation. The gem, the meteorite and the crystal are readings the form invites, and its origin in a scaled-up house argues against reading it as a constructed myth. The tile room evokes Portugal by quotation. The deep pattern is mostly evoked, and that holds the axis.

Score: 7.3 / 10

5The Swerve (Parekklisis)

The inheritance: the nineteenth-century shoebox halls; the vineyard hall since Berlin, then ascendant; the iconic cultural building after Bilbao; and Koolhaas’s own path, from the Kunsthal at Rotterdam and the Educatorium at Utrecht to the Seattle library opened a year earlier. The departure is real and double. Against the vineyard fashion it returns to the shoebox; against the box in a box wrapped in foyers, it makes the hall the structural core of a monolith and opens its ends to the city, a heresy in a type built to shut out daylight and noise. The stake was paid: a missed festival year, a long overrun, a design taken from an unbuilt house offered as civic monument. What holds it: the free-standing iconic object was already the fashion, and the wager was made inside it.

Score: 8.2 / 10

6The Living Form (Entelecheia)

Would a different form change what the building knows? In its main claim, yes. Because the hall is a tunnel through the solid with glass at both ends, a concert there knows the city outside it; put the same room in a closed shoebox and that knowledge is gone. Because the rest of the house is carved round the hall, every route through it brushes against the hall, looks into it or over it, and going to a concert is a passage through a mass rather than an arrival in a lobby. Form is the instrument of the building’s argument about the music house. The costs: the faceted outside, which is what the city knows, could be changed with little loss to the rooms, and the secondary rooms are a sequence of finishes more than a sequence of forms.

Score: 8.0 / 10

7The Bottomless Well (Apeiron)

Evidence over promise, across twenty-one years. The building has drawn sustained study: as a case of Koolhaas’s method of the carved solid and the programme as plot; as an episode in the concert hall’s return to the shoebox; as a structural problem, the inclined shell carried together with the walls of the hall; as a study in the reuse of an unbuilt design; and in Portugal as civic and cultural policy. It has kept its place in the critical literature of OMA and of the concert hall. What holds the axis below 7.5: the record is short; much of the return is to the story of its making and to the office’s polemics rather than to what the form still yields once grasped; the idea is legible on one visit, and its wit tends to spend itself.

Score: 7.4 / 10

8Pressure on Tradition (Agon)

Scored on force and reach together, in the field of the concert hall and the European cultural building of its decades. The intrinsic force is considerable: it showed that a concert hall could be a structural monolith with the room as its core, that a shoebox could open to the city, and that a hall could be a free object made of its own interior plan rather than a wrapped box. Achieved reach is scored with intrinsic force: real and narrower. It gave Porto a figure and Portugal a modern cultural emblem, and it is among the most cited halls of the 2000s; but the concert hall since 2005 has gone more toward the vineyard or surround room in a sculptural envelope, at Hamburg and Paris, than toward its model, and its glazed ends were not widely followed. It reinforced the shoebox’s return rather than causing it.

Score: 7.8 / 10

9The Imperishable (Aphtharsia)

Weighed on form, use and fabric together, over twenty-one years. The form survives whole and legible as built in 2005, unaltered in any way recorded here. The use has been continuous since the opening, as a concert house with a full programme, and the building has become the identity of the institution that bears its name. The fabric appears to have held, though the record of its maintenance, of the glass and of the weathering of the white concrete is thin, and that thinness is weighed. What holds the axis is age: the survival shown is of two decades, where the figures for buildings so young lie below 8.5, and its surface is of its moment, the iconic object of the years after Bilbao, not yet outlived.

Score: 8.3 / 10

10The Made (Techne)

Judged as command of building, structure and engineering included. The structure is the building’s best making: the inclined planes of white concrete and the long walls of the hall work as one system, Arup’s engineering carrying large openings and steep slopes without a frame expressed or a skin hung, so that the structure bears the idea itself. The corrugated glass at the hall’s ends is an inventive answer to acoustic and visual demands together. The interiors are made with deliberate variety, the gold grain a clever, cheap and effective surface. The costs: the circulation is confusing; the secondary rooms are a collage of finishes of uneven quality; and the overrun speaks of a making not fully in command of its means.

Score: 8.4 / 10

11The Inner Law (Cosmos)

Take the two most distant elements: the bare white facet on the Rotunda and the blue and white tiled room within, or the gilded hall. Do they obey one law? In part. The governing law is clear and strong: one solid, carved, every space a cut through the mass and every opening a view through it, the hall the main cut and the rest subordinate. Structure, plan and approach obey it. What bends it is a second law in the interiors, deliberate collage, each room finished in its own material and register, tiles, aluminium, gold grain and chequer, a law of juxtaposition rather than unity; and the outline itself obeys the logic of a house transplanted, not the logic of the cut. Two laws, one of mass and one of collage, joined by wit.

Score: 7.8 / 10

12The Encompassed (Megethos)

Orders of reality held in one structure: music and its institution, in the hall and the rehearsal and education rooms round it; the civic public, in the plaza, the terraces and a house open through the day; the city, seen through the hall’s glass and given a figure on its ring road; the nation’s craft tradition, by quotation in the tile room; the institution’s economics and politics, in the festival commission and its overrun, though these belong more to the history than to the form. The section integrates music and the public: the house is built round the hall and every route passes it. What holds the axis lowest of the twelve is what is absent: labour, the sacred, the family, the natural order except as weather on glass, and Porto’s history except as quotation.

Score: 6.8 / 10

Act IV · The Reckoning

7.8 / 10 · Final Average

Placement: Tier III · Major

Strongest Dimensions

The Made at 8.4, then The Imperishable at 8.3, The Swerve at 8.2, and The Sublime and The Living Form at 8.0. A structure in which the inclined concrete shell and the long walls of the hall are one system, with corrugated glass at the hall’s ends and a cheap gold grain that reads as gilding from the seats; twenty-one years of continuous use, the form whole as built; a return to the shoebox made into the structural core of a monolith and opened to the city, with the stake paid in a missed festival year and a long overrun; a long gilded room with daylight rippling behind the players; and a form whose concerts know the city outside them.

Limiting Dimension

The Encompassed at 6.8: music, the civic public, the city and the nation’s craft held round the hall, with labour, the sacred, the family, the natural order and Porto’s history absent or present only as weather and quotation. Then The Archetypal Deep at 7.3 and The Bottomless Well at 7.4: the stone hollowed, evoked and presented as wit rather than built as rite; and a short record that returns to the story of the building’s making more than to its form. Then The Inevitable and The Unconcealment at 7.7, and Pressure on Tradition and The Inner Law at 7.8: an outline transplanted from a house; a disclosure that is partly a stance; a reach narrower than its fame; and a law of mass bent by a law of collage. The Archetypal Deep and The Bottomless Well, below the Universal Minimum, with what the building discloses and how far it moved its type, are what hold it below Tier IV. Walt Disney Concert Hall (7.8), of the same years, stands level with it, higher on The Sublime and The Made, lower on what its form compels and discloses; the Guggenheim Museum Bilbao (8.4) and the Sydney Opera House (8.6) stand above it on every one of the twelve.

The Necessity Cap clears at 7.7 against a threshold of 7.5, by two tenths. The Coherence Floor clears: The Living Form at 8.0, The Made at 8.4, The Inner Law at 7.8, each against 7.0. The Epochal Gate is unmet on all five: The Imperishable at 8.3 falls two tenths short of the bar of 8.5, The Swerve at 8.2 three tenths short, Pressure on Tradition at 7.8 seven tenths short, The Unconcealment at 7.7 eight tenths short and The Archetypal Deep at 7.3 a point and two tenths short. The Universal Minimum is unmet at The Archetypal Deep, 7.3, and The Bottomless Well, 7.4, both below 7.5; The Encompassed, which it exempts, clears its own floor of 6.0 at 6.8. Three of the five summit conditions are met, the Necessity Cap, the Coherence Floor and the Megethos Floor. The work stands where its aggregate places it: 7.8, from a sum of 93.4, in the band of Tier III, two tenths short of the 8.0 at which Tier IV begins and short of the 9.0 that the summit requires.

Basis · a reading from knowledge of the building as it stands in 2026 and of its documented plan, section, materials and reception. No plan, image or written source was consulted for this page. The work scored is Casa da Música as it stands: the one building on its raised plaza at the Rotunda da Boavista in Porto, a faceted solid of white concrete with the large hall run through it, the smaller hall, the rehearsal and education rooms, the foyers, stairs and terraces carved round them, and the interiors as finished, in use as a concert house since it opened in April 2005. Nothing of the scored building is recorded as lost, replaced or rebuilt; it stands as built. The city round the Rotunda is context and is not scored. The design is credited to Rem Koolhaas with the Office for Metropolitan Architecture (OMA), with Arup, Cecil Balmond among them, as structural engineers; collaboration is not charged. The derivation of the form from an unbuilt house design of the office’s is given in outline, as OMA has documented it. No documented words are quoted; the Sala Suggia is the building’s own name for its large hall. Facts that could not be verified are not given, among them the partner in charge, the acoustic consultants, the exact seating of the large hall, the seating and glazing of the smaller hall, the resident ensembles, whether the hall’s glass is curtained for concerts, the acoustic reputation of the hall, criticism of the finishes, the dimensions of the solid and the thickness of its walls, the cost and the size of the overrun, the full list of rooms and their finishes, and any repair to glass or concrete since 2005.