The Fifth Desk · Evaluation

Act I · The Map

Architecture · Cable-stayed viaduct · 21st c. · a motorway carried over a gorge on seven split piers and seven masts, the deck level with the plateaus and the valley left open beneath it

Millau Viaduct

Michel Virlogeux and Norman Foster · a cable-stayed viaduct carrying the A75 autoroute across the valley of the Tarn between the Causse du Larzac and the Causse Rouge, scored as the bridge as it stands: the continuous steel deck, its seven concrete piers, the seven masts above them with their stays, and the two abutments · 2,460 metres long in eight spans, two end spans of 204 metres and six central spans of 342 metres; piers of reinforced concrete from about 77 metres to about 245 metres from ground to deck, each splitting into two thinner leaves over roughly its top 90 metres; masts about 87 metres above the deck, an inverted Y over each pier, the highest point about 343 metres above the valley floor; stays in a single central plane, eleven pairs to each mast; a steel orthotropic box deck about 32 metres wide and 4.2 metres deep, shaped against the wind, in plan a very slight curve, the road at most about 270 metres above the river · west of Millau, Aveyron · begun December 2001, inaugurated on 14 December 2004 and opened to traffic on 16 December 2004 · Michel Virlogeux, engineer, author of the structural conception, with Norman Foster, Foster and Partners, architects; built and financed by the Eiffage group under a toll concession, the steel deck fabricated by its steelwork subsidiary, Eiffel · as it stands, whole: nothing of it lost, replaced or rebuilt; the wind screens along the deck were built with the bridge

The Plate · the viaduct in elevation across its valley, the vertical drawn taller than true. The ground runs level at either edge for the two causses and falls between them into the gorge, with strokes at its lowest point for the Tarn; the deck crosses in two straight lines from plateau to plateau on an abutment at each end; seven piers stand under it at equal spans, each as tall as the ground beneath it requires, the second from the left the tallest; each tapers and splits into two leaves over its upper part, and its line runs on through the deck into a mast, two legs meeting above the road and rising as one, with a fan of stays falling to the deck on either side; a dashed line crosses the valley at middle height for the cloud that fills it. Low at the right, small, the deck in section: a shallow box narrowing beneath, a screen at each edge and the mast at its centre

Mode

A motorway viaduct as a public figure; a continuous steel box deck stayed from seven masts over seven split concrete piers, engineer and architect together

Mythos

The crossing: the way carried over the abyss from one high ground to another, built because it is the whole of the work; the road in the sky when cloud fills the valley; the masts as sails or rigging only as allusion

Phase

Begun December 2001; the deck pushed out from both plateaus, the halves meeting over the Tarn in 2004; inaugurated 14 December 2004 and opened to traffic on 16 December 2004; in continuous use since, the tallest bridge structure in the world at its opening

Presentation

Eight spans, 2,460 metres, two of 204 metres and six of 342; seven piers of reinforced concrete up to about 245 metres, each split into two leaves over its top 90 metres; seven masts in an inverted Y about 87 metres above the deck; a single central plane of stays; a steel orthotropic box deck shaped against wind, curved slightly in plan, behind wind screens

Register

Cold, airy and vertiginous seen from below and from the plateau rims; height and dread together on the mornings when cloud fills the valley; brief and level for the driver on the deck

Scale

One crossing of one gorge; the natural order of valley, river, plateaus and weather, the state’s road, a private toll concession, labour and technique, and a town relieved of its traffic

Governing Proposition

A national road had to cross a gorge some two and a half kilometres wide between two plateaus, and the makers kept it high: a steel deck level with the land on either side, carried on seven piers as few as the spans allow, each pier splitting as it rises and running on through the deck into a mast. Almost nothing in the bridge can be taken away, and almost everything in it is made with the full command of its moment. What it holds is a crossing. It gives the valley below a figure and the region an emblem, but the drivers who use it pass in seconds behind screens, and what it discloses concerns the road more than any way of living.

The Road above the Cloud

8.1 / 10
Tier IV · Canonical

Act II · The Essay

Movement I

The Causses

West of Millau, in the Aveyron, the Tarn runs in a valley some two and a half kilometres wide between two limestone plateaus, the Causse du Larzac and the Causse Rouge. The A75 autoroute, carrying a national route, had to cross it. The road could descend into the valley and climb out again, or it could stay high and cross from plateau to plateau. The route that was chosen, after a long debate, kept it high, and the height of the bridge is the height of the land, not a height chosen for effect.

The structural conception is Michel Virlogeux’s, the engineer whose Normandy Bridge, of 1995, held a record span for a cable-stayed bridge. Norman Foster and Foster and Partners joined him as architects. The bridge was built and financed by the Eiffage group under a toll concession, and its steel deck was fabricated by Eiffel, the group’s steelwork subsidiary. Other engineering consultants took part. Collaboration is not charged.

Before the bridge, the crossing of the valley meant the town: traffic on the national route came down into Millau and through it, and in summer it queued there. Building began in December 2001. The bridge was inaugurated on 14 December 2004 and opened to traffic two days later. The toll plaza some kilometres to the north, the visitor area and the town and valley below are its context and are not scored.

Movement II

Seven Piers

The deck is 2,460 metres long in eight spans: two end spans of 204 metres and six central spans of 342 metres, all equal. The equal spans make the piers as few as the deck allows, and each pier stands where the rule puts it, whatever the ground. Seven piers of reinforced concrete rise to the deck, the tallest about 245 metres from the ground and the shortest about 77. None is drawn for composition: each is as tall as the land beneath it requires.

Each pier splits into two thinner leaves over roughly its top 90 metres. The deck is continuous over its whole length, and it grows and shrinks with heat; the split leaves let the tops of the piers bend with it. The split is a requirement before it is a form. It becomes the piers’ taper, the line narrowing and dividing as it rises, only because it is required, and almost nothing in the bridge passes the subtractive test less well than that.

Above each pier a mast rises about 87 metres over the deck, an inverted Y whose two legs continue the two leaves of the pier, and from each mast eleven pairs of stays fall in a single central plane to the deck. The line of the pier runs on through the road into the mast, so that the bridge is one gesture made seven times, from the shortest pier to the tallest, from the abutment on the causse to the mast over the river. Here and there the figure yields. The masts’ height and their shape are partly a figure, and the deck’s very slight curve in plan, a radius of about twenty kilometres, is drawn for the view of the bridge as much as for the road.

Movement III

Launched from Both Ends

The deck is a steel orthotropic box, about 32 metres wide and 4.2 metres deep, shaped against the wind and tested in the wind tunnel. A deck 270 metres above a river, in a valley open to the weather, had to answer the wind first. It was fabricated in segments and launched: pushed out from both plateaus across the piers and across temporary towers standing between them, until the two halves met over the Tarn in 2004. The masts were carried out on the deck and raised into place.

The piers were built in high-performance concrete to their tapering, dividing geometry. The whole bridge was built in about three years. The stake was real: wind on the deck at that height, a private consortium carrying the cost and the risk, and the method of launching itself. The bridge stood, when it opened, as the tallest bridge structure in the world, its highest point about 343 metres above the valley floor.

The means were the state of the art, used supremely, not a new one, and the stayed system itself is standard. The costs of the making are at deck level. Wind screens line the deck, built with the bridge as part of it, and they blur the deck’s edge and close the gorge from the driver’s sight; they follow a plainer law than the piers and masts and are the one discord in the work. The details at deck level are those of an excellent motorway, and no more.

Movement IV

Above the Cloud

The bridge is seen best from where it is not crossed. From the valley floor the piers rise to about 245 metres and taper into their leaves; from the rims of the plateaus the whole line is drawn across the gorge, eight spans and seven masts at even intervals. On autumn mornings cloud fills the valley, and the deck and masts stand on it with the ground gone: height and dread together, cold and airy, and frequent, because the cloud is the site’s own weather.

In that weather the crossing, the one archetype the bridge builds, takes a second and older form: the road in the sky, carried over the abyss from one high ground to another. The crossing is not alluded to; it is the whole of the work. But it is the bridge’s by type, shared by every great viaduct, and the bridge adds to it little beyond scale. No threshold, ascent or procession is constructed. The masts read as sails or as a ship’s rigging only by allusion, and that is not credited.

For those who use it the bridge is brief. The crossing is lived at motorway speed for under two minutes, behind the screens, and from the deck the bridge is felt more than seen. Put a girder viaduct on heavy piers in its place, or a lower road with a shorter bridge and long descents, and the drive would change little. The summit of the work is almost wholly the bridge seen from elsewhere, and its form knows most for those who do not cross it.

Movement V

The Town Below

What the bridge gives is given below it. The valley, the river and the town are left largely untouched under a few slender supports; the summer queues through Millau become a few seconds in the air; and the town is given a skyline it did not build. The bridge disclosed that a national road can cross a landscape without entering it, that infrastructure at the scale of geography can become a figure a region names itself by, and that the state’s road can be built and paid for by a private concession under toll. These are disclosures about infrastructure more than about a way of living, and much of what the bridge gives is a mood of grandeur and lightness.

It has been studied since as engineering, for its aerodynamics, its piers, its launching and its monitoring under wind and heat, and photographed without end. Multi-span stayed crossings and very high viaducts have multiplied since, and this is the one they are measured against; the partnership of engineer and architect on major infrastructure became a norm. The form survives whole after twenty-two years, in continuous use since 2004 and unchanged in kind. But twenty-two years is a short record, and the bridge is tied to the motorway and the car, which it has not yet outlived.

The Golden Gate Bridge (8.3) stands two tenths above it, on a far longer survival and on a gate built into its towers where this bridge builds only the crossing every bridge has; the Pont du Gard (8.4), another crossing of a valley, stands above it on necessity and on the evidence of long survival, level with it on The Made. The Forth Bridge (8.6) stands above it too. 30 St Mary Axe (7.9), of the same years and the same architect, stands two tenths below: its form was chosen first and argued from the wind second, where this bridge’s height and spans were forced by the gorge. The Burj Khalifa (7.8), the other record structure of its decade, stands below it on necessity and form. Its strength is the necessity of its form and the command of its making; its limit is that what it holds is a crossing.

Act III · The Twelve

1The Inevitable (Ananke)

Judged on structure, purpose and site, the subtractive test finds almost nothing to take away. The route had to cross a gorge some 2.5 kilometres wide between two plateaus without descending into the valley, so the height is compelled by the land, not chosen for effect. The equal spans of 342 metres make the piers as few as the deck allows; each pier’s height is set by the ground beneath it, not by composition. The split upper leaves are required by the continuous deck’s movement in heat, and become the piers’ taper only because they are required. What yields: the masts’ height and their inverted Y are partly a figure, the deck’s slight curve is drawn for the view of the bridge as well as for the road, and the wind screens are a concession added to the form, not drawn out of it.

Score: 8.7 / 10

2The Unconcealment (Aletheia)

What the bridge brings into the open can be stated, and it holds. A national road can cross a landscape without entering it: the valley, the river and the town are left below and largely untouched, and a crossing that once meant summer queues through Millau becomes a few seconds in the air. It discloses that infrastructure at the scale of geography can be made a public figure, a thing a region names itself by, and that the state’s road can be built and paid for by a private concession under toll. What holds the axis below the Universal Minimum: these are disclosures about infrastructure more than about a way of living, dwelling or worship, and most of what the bridge gives, the line above the cloud and the masts in mist, is a mood of grandeur and lightness, which ranks below a meaning.

Score: 7.4 / 10

3The Sublime (Hypsos)

Height is very high and frequent from outside. It comes in the view from the valley floor, the piers rising to about 245 metres and tapering into their split leaves; in the whole line seen from the plateau edges, eight spans drawn across the gorge with the masts at even intervals; and above all in weather, when cloud fills the valley and the deck and masts stand on it with the ground gone, an image of height and dread together that returns with the autumn mornings. The register is cold, airy and vertiginous. What holds the axis: the purpose, the crossing itself, is lived at motorway speed for under two minutes behind wind screens, and from the deck the bridge is felt more than seen. Its summit is almost wholly the bridge seen from elsewhere.

Score: 8.8 / 10

4The Archetypal Deep (Mythos)

One archetype is built, not evoked: the crossing, the way carried over the abyss from one high ground to another. It is load-bearing in the literal sense, because it is the whole of the work. When cloud fills the valley, the deck gives that crossing a second and older form, the road in the sky. It stays particular: this gorge, these two causses, this river far below. What holds the axis is that the archetype is the bridge’s by type, shared by every great viaduct, and the work adds little to it in plan or section beyond scale. No threshold, ascent or procession is constructed, and the readings of the masts as sails or a ship’s rigging are allusion, and are not credited.

Score: 7.6 / 10

5The Swerve (Parekklisis)

The inheritance: the cable-stayed bridge, by 2000 a mature type, with multi-span stayed bridges already built, Morandi’s at Maracaibo and Ting Kau at Hong Kong, and Virlogeux’s own Normandy Bridge of 1995 holding a record span; and the tall viaduct on concrete piers. The departure: a continuous stayed deck over six equal main spans at a height no bridge had reached, the piers split to release the deck’s movement and drawn as one tapering line with the masts above, and a steel deck launched across the gorge at that height. The stake was real: wind on a deck 270 metres up, a private consortium carrying the cost and the risk, the method of launching itself. The type was inherited, and the turn is in degree and in synthesis more than in kind.

Score: 8.0 / 10

6The Living Form (Entelecheia)

Substitute a different form: a girder viaduct on heavy piers, or a lower route with a shorter bridge and long descents. The road would still be carried, and the drive across would change little, so in its purpose the form’s knowledge is partial. What the form alone knows lies elsewhere: the lightness with which the crossing is made, the valley left open under a few slender supports, the forces made visible as a line of piers running on into masts through the deck, and the bridge as a figure the region lives beside every day. That is a real change in how the crossing is lived by those below it. What holds the axis: those who use it, the drivers, live its form least, and the screens keep the gorge from their sight.

Score: 8.2 / 10

7The Bottomless Well (Apeiron)

Evidence over promise, over twenty-two years. The bridge has been studied and returned to as engineering: its aerodynamics, the design of its piers, its method of launching, the long debate over the route before it was chosen, and its monitoring under wind and heat. It is photographed without end, and weather and light make it new each time. What holds the axis below the Universal Minimum: the yield is mostly of one kind, technical and pictorial, and what the form means was largely exhausted by its first reading, height, lightness and the crossing. The record is short, and the axis is evidentiary.

Score: 7.4 / 10

8Pressure on Tradition (Agon)

The field is bridge engineering and the public infrastructure of Europe in its decades; standing since 2004, the bridge is scored on force and reach together. The intrinsic force is real: it showed that a multi-span stayed deck could be carried continuously at extreme height on split piers, that such a deck could be launched in steel across a deep gorge, and that a national road could be given the care of an architectural commission without loss to the engineering. Achieved reach is scored with intrinsic force: considerable but diffuse. Multi-span stayed crossings and very high viaducts have multiplied since, and Millau is the reference they are measured against; the partnership of engineer and architect on major infrastructure became a norm. But the multi-span stayed bridge was being built in the same years, and its lessons entered a practice that did not need this bridge to begin.

Score: 8.2 / 10

9The Imperishable (Aphtharsia)

Weighed on form, then use, then fabric, over twenty-two years. The form survives whole, altered in nothing, and does not yet read as a period piece. The use has been continuous and intensive since December 2004, as the crossing of a national route, and unchanged in kind. The fabric stands as built: nothing of it has been lost, replaced or rebuilt. Its presence is very wide, and presence earns at most a tenth. What holds the axis is age. Twenty-two years of survival sit well below the fifty-year band, and the bridge is tied to a technology and a mode of travel, the motorway and the car, that it has not yet outlived. A long life ahead is a prediction, and prediction is not demonstration.

Score: 8.3 / 10

10The Made (Techne)

Judged as command of building, structure and engineering included, the making bears load in every sense. Piers up to about 245 metres were built in high-performance concrete, tapering and splitting to a geometry at once structural and expressive. A steel box deck 2.46 kilometres long was shaped against wind, fabricated in segments, and pushed out from both ends across temporary towers until the halves met over the river. The masts were carried out on the deck and raised into place. The whole was built in about three years. The costs: the stayed system itself is standard; the wind screens, a necessary addition, blur the deck’s edge and the crossing’s view; and the details at deck level are an excellent motorway’s, not more. The means were the state of the art, used supremely, not a new one.

Score: 9.2 / 10

11The Inner Law (Cosmos)

Take the two most distant elements: the shortest pier, about 77 metres, and the tallest, about 245 metres, over the valley floor; or the abutment on the causse and the mast over the river. All obey one law: equal spans, one pier profile scaled to the ground, one mast, one fan of stays, one deck section, so that the varying land is read against an unvarying rule. The line of each pier runs through the deck into its mast, and the whole bridge is one gesture made seven times. The range is wide in scale, from rock to cloud, and narrow in kind, one module and one language of material, and narrowness is not coherence. The screens follow a plainer law of their own, and are the one discord.

Score: 8.6 / 10

12The Encompassed (Megethos)

Orders held: the natural order, in the gorge, the river, the two plateaus and the weather that fills the valley; the state and the region, as a national route completed and a region given its emblem; money, in a private concession under toll; labour and technique, visible in the making; and the town below, relieved of its traffic and given a skyline. They are joined in one structure, which carries the road over the land and so sets the state’s route against the natural order in a single line: a real integration, but a thin one. What holds the axis lowest of the twelve is what is absent: the household, the sacred, the body beyond the passing driver, consciousness, death, and history before the road. A bridge holds a crossing, and the figure describes the form.

Score: 6.7 / 10

Act IV · The Reckoning

8.1 / 10 · Final Average

Placement: Tier IV · Canonical

Strongest Dimensions

The Made at 9.2, The Sublime at 8.8, The Inevitable at 8.7 and The Inner Law at 8.6. Piers of high-performance concrete up to about 245 metres, tapering and splitting, and a steel box deck 2.46 kilometres long shaped against wind and pushed out from both plateaus until the halves met over the river, built in about three years; an elevation from the valley floor, the plateau rims and the cloud that fills the gorge; a height compelled by the land, spans as few as the deck allows and piers split because the deck must move; and one law of span, pier, mast and stay repeated seven times against a varying ground.

Limiting Dimension

The Encompassed at 6.7: the natural order, the state’s road, private finance, labour and a town are held in one line, thinly, with the household, the sacred, the body, death and history before the road absent. Then The Unconcealment and The Bottomless Well at 7.4: disclosures about infrastructure more than about a way of living, much of the gift a mood; and a short record yielding of one kind, technical and pictorial. Then The Archetypal Deep at 7.6: the crossing built, but the crossing every bridge has, with no threshold or ascent. These hold the work at the foot of Tier IV, and they are one fact: a supreme work of making whose consequence is narrower than its craft, because what a road bridge holds is a crossing. The Golden Gate Bridge (8.3) stands above it on The Imperishable, The Archetypal Deep and The Bottomless Well; the Chrysler, Empire State and Woolworth Buildings and the Palazzo Farnese stand level with it at 8.1, reaching the band on long survival where this bridge reaches it on necessity and making.

The Necessity Cap clears at 8.7 against a threshold of 7.5, by a point and two tenths. The Coherence Floor clears: The Living Form at 8.2, The Made at 9.2, The Inner Law at 8.6, each against 7.0. The Epochal Gate is unmet on all five: The Imperishable at 8.3 falls two tenths short of the bar of 8.5, Pressure on Tradition at 8.2 three tenths short, The Swerve at 8.0 five tenths short, The Archetypal Deep at 7.6 nine tenths short and The Unconcealment at 7.4 a point and a tenth short. The Universal Minimum is unmet at The Unconcealment, 7.4, and The Bottomless Well, 7.4, both below 7.5; The Encompassed, which it exempts, clears its own floor of 6.0 at 6.7. Three of the five summit conditions are met. The work stands where its aggregate places it: 8.1, from a sum of 97.1, in the band of Tier IV, at its foot, and short of the 9.0 that the summit requires.

Basis · a reading from knowledge of the bridge as it stands in 2026 and of its documented form, structure and history: well on the governing facts (dates, spans, pier and mast heights, the split piers, the steel box deck, the launching), less fully on the detail of its construction, and thinly on its maintenance since 2004 and on its traffic. No drawing, survey or written source was consulted. The unit scored is the cable-stayed viaduct over the valley of the Tarn as it stands: the continuous steel deck, its seven concrete piers, the seven masts above them with their stays, and the two abutments, with the wind screens, which were built with the bridge in its first campaign and are weighed as part of the one work under The Inevitable, The Living Form, The Made and The Inner Law. Nothing of the bridge is recorded as lost, replaced or rebuilt: what stands is what was built in 2001 to 2004. The toll plaza to the north, the visitor area, the town of Millau and the valley below are context only. The structural conception is Michel Virlogeux’s and the architecture is by Norman Foster with Foster and Partners; the bridge was built and financed by the Eiffage group under a toll concession, its deck fabricated by Eiffel; other engineering consultants took part and are not named, since their roles could not be placed with confidence; collaboration is not charged. Nothing is quoted: no inscription or documented statement on the bridge is held word for word. The readings of the masts as sails or rigging are named as allusion and are not credited. Facts that could not be verified are not given, among them the year and terms of the design competition, the total number of stays, the weight of steel in the deck, the height of the wind screens, the gradient of the deck, the means by which the deck was pushed and guided and the month in which the halves met, the cost, the length of the concession, the design life written into the contract, and the record of maintenance since 2004.